Imagen de avatar Fuji Building Passenger Elevtors
apassengerliftchina

The soles of the shoes should not be too hard or too soft

Preparation work before site measurement of elevator shaft 1. If there is lifting equipment on the spot, you can measure the machine room and the top floor to save energy. You should also borrow a helmet from the construction unit to wear. A flashlight is necessary if the scene is dark.0pt;font-famhansi-font-family:

Calibri;mso-hansi-theme-font:minor-latin;mso-font-kerning:1. Cooperate: It is better for hoistway surveying with someone to cooperate, especially when measuring the escalator hoistway, it is very inconvenient to carry a person alone.8 5. For large projects with a large area, a large number of elevators, and a relatively scattered hoistway, you can ask the user for a general plan before entering the site, or draw a sketch of the elevator location distribution by yourself, so as to find the location of each hoistway smoothly .

The soles of the shoes should not be too hard or too soft to prevent crippling or pinching the feet. Measuring tools: Sometimes it is inconvenient to borrow them on site, it is best to bring your own.0001pt;mso-pagination:widow-orphan;font-size:10.4pt 0cm 5.4pt;mso-para-margin:0cm;mso-para- margin-bottom:. It is best to wear long-sleeved tops and trousers to avoid being scratched by the Residential elevator building materials.

Know the site: Before the measurement, you should understand the situation on the site from the user or the technical personnel of the construction unit, so as to prepare the tools purposefully and focus on the special structure measurement. 3. Generally, a 5-meter steel tape is required for straight ladder measurement, and a 20-meter leather tape is required for escalators.

Don’t forget to bring paper and pen! 4. 2. Make an appointment: make an appointment with the user or construction unit before going to the construction site, so that you can get a good cooperation on the spot. It is best to bring your own compass for large construction sites, so as not to get lost in the building or building group (the total price of the above tools does not exceed 40 yuan). When climbing high-rise stairs, physical exertion is great, so you can bring a bottle of water.noshow:yes;mso-style-priority:99;mso-style-parent:”;mso-padding-alt:0cm 5. You can bring a colleague or ask the user to send someone to cooperate.5pt;mso-bidi-font-size:11. Clothing: If the building is under construction, it is best not to wear sandals when entering the construction site. Normal07

Tags:

Deja un comentario