Imagen de avatar High-quality plastic pipe cutter
chaoneng

Managing risks through secure systems and behaviors is the right search

In a petrochemical industry, during scaffolding operations, a supervisor gave a job to his workers: dismantle scaffolding from the top of the chimney. An engineer, who was aware of this work in progress, still sent his welder for welding operations at a height of 12 meters urgently. A worker reached a height of 40 meters and began to dismantle the scaffolding. EHS risks and compliance issues remain everywhere during operations, but if workers remain alert and connected, safety will never be compromised. The risk assessment is key in such cases to ensure that everyone remains safe while they work. In the previous incident, all the errors combined led to the death of a worker. To establish and maintain a clear and compelling vision of security, conflicts must be treated in the healthiest way. Awareness in workers through training allows closer scrutiny of such events; In the workplace, when the pace of activities increases, it becomes necessary to carry out the Pipe Welders Suppliers tasks with great care.

Now, this resulted in a conflict activity: two workers, working in one place, one at a height of 40 meters and another at 12 meters; exactly below the worker who performs the scaffolding activity. Therefore, it remains our main agenda to protect and work in a responsible and safe way. But the important thing is conflict resolution, as it is said to be a critical skill for leadership. Here is a testimony to support the same.In security, conflict activities can lead to lapses in safety precautions at manufacturing plants or work sites and, in the worst case, can dangerously sabotage work. The height of the chimney was approximately 55 meters. It works as a protection wall; prevents accidental fall of people or objects from the site. You can’t buy life.

Here, there were two errors: one from the engineer and one from the site supervisor. Even the site supervisor could not monitor the activities of his site as it could have prevented the welder from performing the activity. The supervisor informed the rescue team for immediate rescue. The vertical pipe hit the head of the welder and, in seconds, led to the loss of life of the worker. Unfortunately, when removing the scaffolding, a 6-meter pipe, weighing approximately 20 kg, fell from his hand and fell directly onto the welder’s head.Even the welder, before performing his task, should have checked the job site for any work in progress for his own safety purposes. The reason why the welding job could have become too risky for the worker to carry out the subsequent dismantling. Before starting to work at height, we must ensure that there is no one working up or down (with respect to the exact location of the job). Despite arriving at the location of the injured welder within 10 minutes after the accident, the severity of the head trauma led to his death..Conflicts in the workplace, as all plant managers know, are simply part of the job.

The previous incident offers safety learning: as far as possible, whenever we work at height, only one person must work at a time (depends on the severity of the work and the preventive measures adopted), and the appropriate monitoring for it help. Despite the scaffolding work in progress, the engineer considered giving his permission for a conflict activity in the first place. In addition, the entire security department lost the greatest need: the material safety net.

Tags:

Deja un comentario