Imagen de avatar Gears and Shafts Steel Spur Gears
cardecorative

The auxiliary time is coincident with the basic time and indirectly shorten the auxiliary time

In recent years, the polycrystalline diamond and the polycrystalline cubic boron nitride tool cuts the cutting speed of ordinary steel reaches 900 m / min. Adopting advanced tools and machine tools to achieve high-speed, efficient cutting, and use related technologies and management methods to optimize the entire processing process, using a variety of ways to improve processing efficiency and achieve high-speed cutting.Implementing machine tools to see multiple machine tools are an advanced labor organization measures. Using less cutting. There are two ways to shorten preparation and end time: First, expand product production batch to relatively reduce preparation and end time on each part; second,custom car Interior directly reduce preparation and end time.

Automated manufacturing system automation production system is an organic whole consisting of a certain range of processing objects, a certain flexible and automation level, and is an organic overall, which accepts external information, energy, funds, and supporting parts. Shorten the process measures prepared and end time. As the new tool material appears, the cutting speed has been rapidly improved. Improve parts made of parts made of non-cutting methods and parts manufactured by lower cutting methods.

The plurality of processing methods have the following: sequential multi-piece machining, parallel multi-piece processing, parallel sequence multi-piece processing. Directly reduce the auxiliary time. Process measures for improving the productivity productivity  shortening the first and shortening the basic time of the basic time. Blank preparation. Generally, the strength and hardness of strength, good plasticity and toughness, poor thermal conductivity, the cutting performance is poor, and it is better. . Such as cold extrusion gears, rolling screws, etc.

A worker is managing several machine tools to increase productivity is obvious, but it should meet two necessary conditions: First, if one person looks at the M-Table machine, the workers on any M-1 machine tool should be less than another. Shorten the auxiliary time has two different ways, one, so that the auxiliary action is mechanized and automated, thereby directly reduced the auxiliary time; second, the auxiliary time is coincident with the basic time and indirectly shorten the auxiliary time. Improve the structural process of the part in order to make the mechanical product have good structural process.

Tags:

Deja un comentario