It is suggested that the government construction administrative department should put forward or stipulate the rigid requirements of housing construction and solar construction;synchronous design, simultaneous construction, and simultaneous completion’.However, this calculation process is very complicated, so people often directly use the data on the horizontal plane, or use the method of empirical coefficients for simple conversion, which has an impact on the accuracy of the calculation.

Planning first is the key to the integration of solar photovoltaic buildings Solving the integration of solar energy and building, and solving the coordination and unification of architectural design and solar construction is actually not a technical problem.2 Measures to prevent the charge controller from being struck by lightning To prevent lightning strikes, we must first understand the way thunder and lightning invade the power system.led floodlight factory The use of PV panels in the building not only makes good use of solar energy, greatly saves the use of energy in the building, but also enriches the facade design and facade aesthetics of the building.

The working status of the battery pack in each period. The master establishes the grid to determine the basic parameters of the grid such as voltage, frequency, and phase. Inverter superimposed use and control inverter-advantages and disadvantages of the body machine The installation site should consider the traffic and transportation conditions, and there should be roads nearby to facilitate the transportation of photovoltaic modules, control cabinets, and batteries. One year The sun window time is different in the four seasons. It will provide us with new energy and new technologies. If there are more than two power points, the tie line can be connected in a ring network or double-circuit to improve the reliability of power supply and transmission and distribution. Through direct observation on the roof, wall, yard or direct observation, find the best position to meet the annual sunshine conditions of the phalanx.  Failure analysis and suggestions for preventive measures.

The grid load should be managed according to different levels of users. Of course, the required battery capacity is also affected by the load scale, reducing the load will reduce the required battery capacity. However, it should be noted that an off-grid photovoltaic power generation project, especially an off-grid photovoltaic power generation project in rural areas in remote areas, creates additional value for the entire society. For off-grid independent village power stations, the power grid will not extend to this point in the short term to avoid unnecessary duplication of construction and future power station relocation.1 Solar resource data Solar radiation data can be obtained from the county-level meteorological station or the National Meteorological Administration.

Tags:

Deja un comentario